Maintenance
Management - A New Paradigm
|
|
by
John Moubray
|
|
Abstract:
|
|
This paper attempts to summarise fifteen of the most important areas of
change which have occurred in the field of physical asset management over
the past fifteen years. |
|
The paper is based on the experience gained by the author and his associates
from the application of RCM and its more modern derivative, RCM2, on more
than 500 industrial sites in 27 countries over a period of 10 years. |
|
On the basis of this work, it has become evident that any organisation
that wishes to achieve rapid, substantial and lasting improvements in maintenance
effectiveness - in other words, in physical asset performance - must ensure
that everyone associated with the operation and maintenance of these assets
profoundly understands and internalises both the nature and significance
of these changes. |
|
PARADIGM:
|
|
Pattern or model
|
|
Oxford Dictionary
|
|
|
MAXIM:
|
|
Piece of wisdom
or rule of conduct expressed in a sentence
|
|
Oxford Dictionary
|
|
|
Introduction
|
|
The subject of change dominates nearly everything currently being written
about management. All disciplines are being exhorted to adapt to changes
in organisation design, in technology, in leadership skills, in communication
- in fact, in virtually every aspect of working life. |
|
Perhaps nowhere is this felt more broadly and deeply than in the field
of physical asset management. |
|
A striking feature of this phenomenon is the number of changes which have
occurred simultaneously. Some have occurred at a strategic - almost philosophical
- level, while others are more tactical - or technical - in nature. |
|
Even more striking is the extent of the changes. Not only do they involve
radical changes of direction (some diametrically opposed to the way things
have been done in the past), but a few ask us to come to terms with entirely
new concepts. |
|
This paper identifies fifteen key areas of change. Each of them on its
own is sufficiently far-reaching to merit a great deal of attention in
most organisations. Together they amount to a whole new paradigm. Accommodating
this paradigm shift means that for most of us, the management of physical
assets is going to become a monumental exercise in change management over
the next few years. |
|
Each of the changes on its own is also sufficient to form the subject of
one - if not several - books (think of all the books available on the subject
of predictive maintenance alone), so a short paper like this cannot hope
to explore all the changes in detail. In fact, it goes to the opposite
extreme by reducing each area of change to two maxims followed by a short
explanation. In each case, one maxim attempts to summarise the way things
used to be, while the other summarises the way things are - or should be
- now. |
|
There
is bound to be an element of oversimplification in any attempt to summarise
any one issue in one or two sentences, let alone fifteen issues. However,
such a summary does fulfil two purposes:
|
-
it provides a quick overview
of what the changes are
|
-
it provides a basis for comparing
the different decision support tools and management philosophies that claim
to provide a basis for action (RCM, FMECA, MSG3, HAZOP, TPM, RCA, RBI,
RCM2 and others). This paper only summarises the fifteen areas of change.
|
|
Maxim
1
|
|
OLD
|
|
Maintenance is
about preserving physical assets
|
|
NEW
|
|
Maintenance is
about preserving the functions of assets
|
|
|
Most people become engineers because they feel at least some affinity for
things, be they mechanical, electrical or structural. This leads us to
derive pleasure from assets in good condition, but feel offended by assets
in poor condition. |
|
These reflexes have always been at the heart of the concept of preventive
maintenance. They have given rise to concepts like "asset care", which
as the name implies, seeks to care for assets per se. They have also led
maintenance strategists to believe that maintenance is all about preserving
the inherent reliability or built-in capability of any asset. In fact,
this is not so. |
|
As we gain a deeper understanding of the role of assets in business, we
begin to appreciate the significance of the fact that any physical asset
is put into service because someone wants it to do something. So it follows
that when we maintain an asset, the state which we wish to preserve must
be one in which it continues to do whatever its users want it to do. This
in turn implies that we have to focus our attention on maintaining what
each asset does rather than on what it is. |
|
Clearly, before we can do this, we must gain a crystal clear understanding
of the functions of each asset together with the associated performance
standards |
|
For instance, Figure 1 shows a pump with a nominal capacity of 400 litres/minute
pumping water into a tank from which it is being drawn at a rate of 300
litres/minute. In this case, the primary function of the pump is "to supply
water to the tank at not less than 300 litres/minute". Any maintenance
programme for the pump should try to ensure that its performance does not
drop below 300 litres/minute. (Note that in seeking to ensure that the
tank does not run dry, the maintenance program does not try to ensure that
the pump continues "to be able to supply water to the tank at not less
than 400 litres/minute".) |
|
|
However, if exactly the same pump is moved to a different tank where the
offtake is 350 litres/minute, the primary function is changed accordingly
and so the maintenance programme must now change to accommodate the higher
performance expectation. |
|
Functions and performance expectations not only cover output. They also
concern issues such as product quality, customer service, economy and efficiency
of operation, control, containment, comfort, protection, compliance with
environmental regulations, structural integrity and even the physical appearance
of the asset. |
|
Maxim
2
|
|
OLD
|
|
Routine maintenance
is about preventing failures
|
|
NEW
|
|
Routine maintenance
is about avoiding, reducing or eliminating the consequences of failures
|
|
|
A detailed analysis of an average industrial undertaking is likely to yield
between five and ten thousand possible failure modes. Each of these failures
affects the organisation in some way, but in each case, the effects are
different. They may affect operations. They may also affect product quality,
customer service, safety or the environment. They will all take time and
cost money to repair. |
|
It is these consequences which most strongly influence the extent to which
we try to prevent each failure. If a failure mode has serious consequences,
we are likely to go to great lengths to try to prevent it. If it has little
or no effect, then we may decide to undertake no preventive action. |
|
In other words, the consequences of failures are far more important than
their technical characteristics. |
|
For example, one failure which could affect the pump shown in Figure 1
is "bearing seizes due to normal wear and tear". Assuming that it takes
4 hours to replace a failed bearing, and that the unanticipated failure
of the bearing only comes to the attention of the operators when the level
in the tank drops to the low level switch, the tank only contains a 2.5
hour supply of water, so it would run dry and remain empty for 1.5 hours
while the bearing is repaired. |
|
One condition-based task which could apply to this bearing is to monitor
vibration levels using a vibration analyser. If incipient failure is detected,
the first priority of the operators would be to fill the tank before the
bearing seizes, thus giving themselves 5 hours to do a 4 hour job. This
in turn enables them to avoid the consequences of an empty tank (and also
avoid possible secondary damage to the pump). The task does not "save"
the bearing - that is doomed whatever happens. |
|
This example demonstrates that the main reason for doing any kind of proactive
maintenance is to avoid, reduce or eliminate the consequences of failure.
A formal review of failure consequences focuses attention on maintenance
tasks that have most effect on the performance of the organisation, and
diverts energy away from those which have little or no effect. |
|
Maxim
3
|
|
OLD
|
|
The primary objective
of the maintenance function is to optimise plant availability at minimum
cost
|
|
NEW
|
|
Maintenance affects
all aspects of business effectiveness and risk - safety, environmental
integrity, energy efficiency, product quality and customer service, not
just plant availability and cost
|
|
|
Downtime has always affected the productive capability of physical assets
by reducing output, increasing operating costs and interfering with customer
service. By the 1960's and 1970's, this was already a major concern in
the mining, manufacturing and transport sectors. In manufacturing, the
effects of downtime are being aggravated by the worldwide move towards
just-in-time systems, where reduced stocks of work-in-progress mean that
quite small breakdowns are now much more likely to stop a whole plant.
In recent times, the growth of mechanisation and automation means that
reliability and availability have now also become key issues in sectors
as diverse as health care, data processing, telecommunications and building
management. |
|
The cost of maintenance has also been rising at a steady pace over the
past few decades, in absolute terms and as a proportion of total expenditure.
In some industries, it is now the second highest or even the highest element
of total costs. So in only 40 years maintenance has moved from nowhere
to the top of the league as a cost control priority. |
|
The importance of these two aspects of asset management means that many
maintenance managers still tend to view them as the only significant objectives
of maintenance. |
|
However, this is no longer the case, because the maintenance function now
has a wide range of additional objectives. These are summarised in the
following paragraphs. |
|
Greater automation means that more and more failures affect our ability
to achieve and sustain satisfactory quality standards. This applies as
much to standards of service as it does to product quality. For instance
equipment failures affect climate control in buildings and the punctuality
of transport networks as much as they interfere with the consistent achievement
of specified tolerances in manufacturing. |
|
Another result of growing automation is the rising number of failures which
have serious safety or environmental consequences, at a time when standards
in these areas are rising fast. Many parts of the world are reaching the
point where organisations either conform to society's safety and environmental
expectations, or they get shut down. This adds an order of magnitude to
our dependence on the integrity of our physical assets - one which goes
beyond cost and becomes a simple matter of organisational survival. |
|
At the same time as our dependence on physical assets is growing, so too
is their cost - to operate and to own. To secure the maximum return on
the investment which they represent, they must be kept working efficiently
for as long as their users want them to. |
|
These developments mean that maintenance now plays an increasingly central
role in preserving all aspects of the physical, financial and competitive
health of the organization. This in turn means that maintenance professionals
owe it to themselves and their employers to equip themselves with the tools
needed to address these issues continuously, proactively and directly,
rather than deal with them on an ad hoc basis when time permits. |
|
Maxim
4
|
|
OLD
|
|
Most equipment
becomes more likely to fail as it gets older
|
|
NEW
|
|
Most failures
are not more likely to occur as equipment gets older
|
|
|
For decades, conventional wisdom suggested that the best way to optimise
the performance of physical assets was to overhaul or replace them at fixed
intervals. This was based on the premise that there is a direct relationship
between the amount of time (or number of cycles) equipment spends in service
and the likelihood that it will fail, as shown in Figure 2. This suggests
that most items can be expected to operate reliably for a period "X", and
then wear out. |
|
Classical thinking held that X could be determined from historical records
about equipment failure, enabling users to take preventive action shortly
before the item is due to fail in future. This predictable relationship
between age and failure relationship is indeed true for some failure modes.
It tends to be found where equipment comes into direct contact with the
product. Examples include pump impellers, furnace refractories, valve seats,
crusher liners, screw conveyors, machine tooling and so on. Age-related
failures are also often associated with fatigue and corrosion. |
|
|
However, equipment in general is much more complex than it was even fifteen
years ago. This has led to startling changes in the patterns of equipment
failure, as shown in Figure 3. The graphs show conditional probability
of failure against operating age for a wide variety of electrical and mechanical
items. |
|
Pattern A is the well-known bathtub curve, and pattern B is the same as
Figure 2. Pattern C shows slowly increasing probability of failure with
no specific wearout age. Pattern D shows low failure probability to begin
with then a rapid increase to a constant level, while Pattern E shows a
constant probability of failure at all ages. Pattern F starts with high
infant mortality and drops eventually to a constant or very slowly increasing
failure probability. |
|
|
Studies on civil aircraft showed that 4% of the items conform to pattern
A, 2% to B, 5% to C, 7% to D, 14% to E and no fewer than 68% to pattern
F. (The distribution of these patterns in aircraft is not necessarily the
same as in industry, but as equipment grows more complex, more and more
items conform to patterns E and F.) |
|
These findings contradict the belief that there is always a connection
between reliability and operating age - the belief which led to the idea
that the more often an item is overhauled, the less likely it is to fail.
In practice, this is hardly ever true. Unless there is a dominant age-related
failure mode, fixed interval overhauls or replacements do little or nothing
to improve the reliability of complex items. |
|
Most maintenance professionals are aware of these findings, and coming
to terms with the reality of randomness after decades in the bathtub. However,
the fact that the bath-tub curve still features in so many texts on maintenance
is testimony to the almost mystical faith that some people still place
in the relationship between age and failure. In practice, this faith has
two serious drawbacks, as follows: |
-
it leads to the belief that
if we don't have any hard evidence at all about the existence of an age-related
failure-mode, it is wise to overhaul the item anyway from time to time
"just-in-case" such a failure mode does exist. This ignores the fact that
overhauls are extraordinarily invasive undertakings that massively upset
stable systems. As such, they are highly likely to induce infant mortality,
and so cause the very failures which they seek to prevent. This is illustrated
in Figure 4.
|
|
-
at a more philosophical level,
bathtub believers convince themselves that it is more conservative (in
other words, safer) to assume that everything has a life - and hence to
overhaul equipment on the basis of an assumed life - than to assume it
could fail at random. After implementing overhaul programs based on this
assumption, they then assume that no failures should occur between overhauls,
and that any which do occur cannot be attributed to maintenance "because
we overhauled it last week/last year/whenever". The possibility that the
overhaul itself may be the cause of the failure is usually completely lost
on such people. More seriously, they simply refuse to accept the most important
conclusion associated with maxim 4, which is summarised below:
|
|
In the absence of any evidence to the contrary, it is more conservative
to develop maintenance strategies which assume that any failure can occur
at any time (in other words, at random), and not to assume that it will
only occur after some fixed amount of time. |
|
Maxim
5
|
|
OLD
|
|
Comprehensive
data about failure rates must be available before it is possible to develop
a really successful maintenance program
|
|
NEW
|
|
Decisions about
the management of equipment failures will nearly always have to be made
with inadequate hard data about failure rates
|
|
|
A surprising number of people believe that effective maintenance policies
can only be formulated on the basis of extensive historical information
about failure. Thousands of manual and computerised technical history recording
systems have been installed around the world on the basis of this belief.
It has also led to great emphasis being placed on the failure patterns
discussed in the previous section of this paper. Yet from the maintenance
viewpoint, these patterns are fraught with practical difficulties, conundrums
and contradictions. Some of these are summarised below: |
| Sample size and evolution: |
Large industrial processes usually possess only one or two assets of any
one type. They tend to be brought into operation in series rather than
simultaneously. This means that sample sizes tend to be too small for statistical
procedures to carry much conviction. For new assets with high levels of
leading-edge technology they are always too small.
|
These assets are also in a continuous state of evolution and modification,
partly in response to new operational requirements and partly in an attempt
to eliminate failures which either have serious consequences or which cost
too much to prevent. This means that the amount of time any asset spends
in any one configuration is relatively short.
|
So actuarial procedures are not much use in these situations because the
database is very small and constantly changing. (The main exception is
undertakings using large numbers of identical items in an almost identical
manner.)
|
| Complexity: |
The sheer number and diversity of assets present in most industrial undertakings
means that it is simply not possible to develop a complete analytical description
of the reliability characteristics of an entire undertaking - or even any
major asset within the undertaking.
|
This is complicated by the fact that many functional failures are caused
not by two or three but by two or three dozen failure modes. As a result,
while it may be fairly easy to chart the incidence of the functional failures,
it is a major statistical undertaking to isolate and describe the failure
pattern which applies to each of the failure modes. This alone makes sensible
actuarial analysis almost impossible.
|
| Reporting failure: |
Further complications arise due to differences in reporting policy from
one organisation to another. For example, an item may be removed on one
site because it is failing while on another site it is removed because
it has failed.
|
Similar differences are caused by different performance expectations. A
functional failure is defined as the inability of an item to meet a desired
standard of performance. These standards can of course differ for the same
asset if the operating context is different, so what we mean by failed
will also differ. For instance, the pump shown in Figure 1 has failed if
it is unable to deliver 300 litres per minute in one context and 350 litres
per minute in another.
|
These examples show that what is a failure in one organisation - or even
one part of an organisation - might not be a failure in another. This can
result in two quite different sets of failure data for two apparently identical
items.
|
| The ultimate contradiction: |
An issue which bedevils the whole question of technical history is the
fact that if we are collecting data about failures, it must be because
we are not preventing them. The implications of this are summed up most
succinctly by Resnikoff (1978) in the following statement:
|
"The acquisition of the
information thought to be most needed by maintenance policy designers -
information about critical failures - is in principle unacceptable and
is evidence of the failure of the maintenance program. This is because
critical failures entail potential (in some cases, certain) loss of life,
but there is no rate of loss of life which is acceptable to (any) organisation
as the price of failure information to be used for designing a maintenance
policy. Thus the maintenance policy designer is faced with the problem
of creating a maintenance system for which the expected loss of life will
be less than one over the planned operational lifetime of the asset. This
means that, both in practice and in principle, the policy must be designed
without using experiential data which will arise from the failures which
the policy is meant to avoid."
|
Despite the best efforts of the maintenance policy designer, if a critical
failure actually does occur, Nowlan and Heap (1978) go on to make the following
comments about the role of actuarial analysis:
|
"The development of an age-reliability relationship, as expressed by a
curve representing the conditional probability of failure, requires a considerable
amount of data. When the failure is one which has serious consequences,
this body of data will not exist, since preventive measures must of necessity
be taken after the first failure. Thus actuarial analysis cannot be used
to establish the age limits of greatest concern - those necessary to protect
operating safety."
|
This brings us to the ultimate contradiction concerning the prevention
of failures with serious consequences and historical information about
such failures: that successful preventive maintenance entails preventing
the collection of the historical data which we think we need in order to
decide what preventive maintenance we ought to be doing.
|
This contradiction applies in reverse at the other end of the scale of
consequences. Failures with minor consequences tend to be allowed to occur
precisely because they do not matter very much. As a result, large quantities
of historical data are available concerning these failures, which means
that there will be sufficient material for accurate actuarial analyses.
These may even reveal some age limits. However, because the failures don't
matter much, it is highly unlikely that the resulting fixed interval maintenance
tasks will be cost effective. So while the actuarial analysis of this information
may be precise, it is also likely to be a waste of time.
|
| Conclusion: |
Perhaps the most important conclusion to arise from the above comments
is that maintenance professionals should turn their attention away from
counting failures (in the hope that an elegantly constructed scorecard
will tell us how to play the game in the future), towards anticipating
or preventing failures which matter.
|
So to be truly effective, we simply have to get comfortable with the idea
of uncertainty, and deploy strategies which enable us to deal with it confidently.
We also need to recognise that if the consequences of too much uncertainty
cannot be tolerated, then we must change the consequences. In extreme cases
of uncertainty, the only way to do so may be to abandon the process concerned.
|
|
Maxim
6
|
|
OLD
|
|
There are three
basic types of maintenance:
|
|
- predictive
|
|
- preventive
|
|
- corrective
|
|
NEW
|
|
There are four
basic types of maintenance:
|
|
- predictive
|
|
- preventive
|
|
- corrective
|
|
- detective
|
|
|
Most of what has been written to date on the general subject of maintenance
strategy refers to three - and only three - types of maintenance: predictive,
preventive and corrective. |
|
Predictive (or condition-based) tasks entail checking if something is failing.
Preventive maintenance usually means overhauling items or replacing components
at fixed intervals. Corrective maintenance means fixing things either when
they are found to be failing or when they have failed. |
|
However, there is a whole family of maintenance tasks which falls into
none of the above categories. |
|
For example, when we periodically activate a fire alarm, we are not checking
if it is failing. We are also certainly not overhauling or replacing it,
and nor are we repairing it. |
|
We are simply checking if it still works. |
|
Tasks designed to check whether something still works are known as "functional
checks" or "failure-finding tasks". (In order to rhyme with the other three
families of tasks, the author and his colleagues also call them "detective"
tasks because they are used to detect if something has failed.) |
|
Detective maintenance or failure-finding applies only to hidden or unrevealed
failures, and hidden failures in turn only affect protective devices. |
|
If one applies scientific maintenance strategy formulation techniques to
modern, complex industrial systems, it is not unusual to find that up to
40% of failure modes fall into the hidden category. Furthermore, 80% of
these failure modes usually require failure-finding, so up to one third
of the tasks generated by scientific maintenance strategy development programs
- such as RCM2 - are detective tasks. |
|
On the other hand, the same analytical techniques reveal that it is not
unusual for condition monitoring to be technically feasible for no more
than 20% of failure modes, and worth the investment in less than half these
cases. (This is not meant to imply that condition monitoring should be
not be used - where it is good it is very, very good - but that we must
also remember to develop appropriate strategies for managing the other
90% of our failure modes.) |
|
A rather more troubling finding is that most traditionally derived maintenance
programs provide for fewer than one third of protective devices to receive
any attention at all (and then usually at inappropriate intervals). The
people who operate and maintain the plant covered by these traditional
programs are aware that another third of these devices exist but pay them
no attention, while it is not unusual to find that no-one even knows that
the final third exist. This lack of awareness and attention means that
most of the protective devices in industry - our last line of protection
when things go wrong - are maintained poorly or not at all. |
|
This situation is completely untenable. |
|
If industry is serious about safety and environmental integrity, then the
whole question of detective maintenance - failure-finding - needs to be
given top priority as a matter of urgency. As more and more maintenance
professionals become aware of the importance of this neglected area of
maintenance, it is likely to become a bigger maintenance strategy issue
in the next decade than predictive maintenance has been in the last ten
years. |
|
Maxim
7
|
|
OLD
|
|
The frequency
of condition-based maintenance tasks should be based on the frequency of
the failure and/or failure the criticality of the item
|
|
NEW
|
|
The frequency
of condition-based maintenance tasks should be based on the failure period
(also known as the "lead time to failure" or "P-F interval")
|
|
|
When people are discussing the frequency of predictive (or condition-based)
maintenance tasks, one often hears either - sometimes both - of the following
statements: |
-
it doesn't fail so often, so
we don't need to check it so often
|
-
we need to check more critical
plant more often than less critical plant.
|
|
In both cases, the speakers are wrong. |
|
The frequency of predictive maintenance tasks has nothing to do with the
frequency of failure and nothing to do with the criticality of the item.
The frequency of any form of condition-based maintenance is based on the
fact that most failures do not occur instantaneously, and that it is often
possible to detect the fact that the failure is occurring during the final
stages of deterioration. |
|
Figure 5 shows this general process. It is called the P-F curve, because
it shows how a failure starts and deteriorates to the point at which it
can be detected (the potential failure point "P"). Thereafter, if it is
not detected and suitable action taken, it continues to deteriorate - usually
at an accelerating rate - until it reaches the point of functional failure
("F"). |
|
|
The amount of time (or the number of stress cycles) which elapse between
the point where a potential failure occurs and the point where it deteriorates
into a functional failure is known as the P-F interval, as shown in Figure
6. |
|
|
The P-F interval governs the frequency with which the predictive task must
be done. The checking interval must be significantly less than the P-F
interval if we wish to detect the potential failure before it becomes a
functional failure. |
|
The P-F interval can be measured in any units relating to exposure to stress
(running time, units of output, stop-start cycles, etc), but it is most
often measured in terms of elapsed time. For different failure modes, the
P-F interval can vary from fractions of a second to several decades. |
|
The amount of time needed to respond to any potential failures which are
discovered also influences condition-based task intervals. In general,
these responses consist of any or all of the following: |
-
take action to avoid the consequences
of the failure
|
-
plan corrective action so that
it can be done without disrupting production and/or other maintenance activities
|
-
organise the resources needed
to rectify the failure.
|
|
The amount of time needed for these responses also varies, from a matter
of hours (say until the end of an operating cycle or the end of a shift),
minutes (to clear people from a building which is falling down) or even
seconds (to shut down a machine or process which is running out of control)
to weeks or even months (say until a major shutdown). |
|
Unless there is a good reason to do otherwise, it is usually sufficient
to select a checking interval equal to half the P-F interval. This ensures
that the task will detect the potential failure before the functional failure
occurs, while providing a net interval of at least half the P-F interval
to do something about it. However, it is sometimes necessary to select
a checking interval which is some other fraction of the P-F interval. For
instance, Figure 7 shows how a P-F interval of 9 months and a checking
interval of 1 month give a nett P-F interval of 8 months. |
|
|
If the P-F interval is too short for it to be practical to check for the
potential failure, or if the nett P-F interval is too short for any sensible
action to be taken once a potential failure is discovered, then the condition-based
task is not appropriate for the failure mode under consideration. |
|
Maxim
8
|
|
OLD
|
|
If both are technically
appropriate, fixed interval overhauls/replacements are usually both cheaper
and more effective than condition-based maintenance
|
|
NEW
|
|
If both are technically
appropriate, condition-based maintenance is nearly always both cheaper
and more effective fixed interval overhauls/replacements throughout the
life of the asset
|
|
|
The new maxim 8 is now well understood by most maintenance professionals,
and the change is really only recorded here for the sake of completeness.
However, there still remain a small number of people who subscribe to the
old maxim, so it is worth summarising briefly why the new maxim is valid.
Perhaps the best way to do so is by means of an example. |
|
Most countries nowadays specify a minimum legal tread depth for tyres (usually
about 2 mm). Tyres which are worn below this depth must either be replaced
or retreaded. In practice, truck tyres - especially tyres on similar vehicles
in a single fleet working the same routes - show a close relationship between
age and the onset of failure due to normal wear. Retreading restores nearly
all the original resistance to normal wear, so the tyres could be scheduled
for restoration after they have covered a set distance. This means that
all the tyres in the fleet would be retreaded after they had covered a
specified mileage, whether or not they needed it. |
|
|
Figure 8 shows hypothetical failure data for such a fleet which show that
most of the tyres last between 30 000 miles and 50 000 miles. If a fixed-interval
retreading policy designed to prevent all failures due to normal wear is
adopted on the basis of this information, all the tyres will be retreaded
at 30 000 miles. However, this policy also means that many tyres would
be retreaded long before it was really necessary. In some cases, tyres
which could have lasted as long as 50 000 miles would be retreaded at 30
000 miles, so they could lose up to 20 000 miles of useful life. |
|
On the other hand, it is possible to define a potential failure condition
for tyres related to tread depth. Checking tread depth is quick and easy,
so it is a simple matter to check the tyres (say) every 2000 miles and
to arrange for them to be retreaded only when they need it. This would
enable the fleet operator to get an average of 40 000 miles out of his
tyres without endangering his drivers, instead of the 30 000 miles which
he gets if he does the scheduled restoration task described above - an
increase in useful tyre life of 33%. So in this case a predictive task
is much more cost-effective than scheduled restoration. |
|
This example demonstrates that predictive maintenance tasks should be considered
first, for the following reasons: |
-
they can nearly always be performed
without moving the asset and usually while it is in operation, so they
seldom interfere with production. They are also easy to organise.
|
-
they identify specific potential
failure conditions so corrective action can be clearly defined before work
starts. This reduces the amount of repair work to be done, and enables
it to be done more quickly.
|
-
by identifying equipment on
the point of potential failure, they enable it to realise most of its useful
life.
|
-
The number of removals for potential
failures is only slightly larger than that which would result from functional
failures, so total repair costs and spares requirements are minimised.
|
|
Maxim
9
|
|
OLD
|
|
Serious incidents/catastrophic
accidents which involve multiple equipment failures are usually the result
of "bad luck" or "acts of God", and are hence unmanageable
|
|
NEW
|
|
To a considerable
extent, the likelihood of a multiple failure is a manageable variable,
especially in protected systems
|
|
|
In the past, major industrial accidents tended to be seen as just another
part of the overall risk of doing business. It was felt that it was just
too expensive (if not impossible) to analyse industrial systems in enough
detail to be able to manage the risks with any credibility. |
|
In more recent times, reliability professionals have developed powerful
tools (such as probabilistic or quantitative risk assessment) to assess
the cumulative probabilities of failure and associated overall levels of
risk inherent in complex systems. |
|
However, one limitation of these techniques, especially when applied to
protected systems, has been a tendency to regard the probability of failure
of the protected function and protective device as fixed. This leads to
the belief that the only way to change the probability of multiple failures
associated with such systems is to change the hardware (in other words,
to modify the system), perhaps by adding more protection or by replacing
existing components with ones which are thought to be more reliable. |
|
In fact, it is now apparent that it is possible to vary both the probability
of failure of a protected function and (especially) the downtime of the
protective device by adopting suitable maintenance and operating policies.
As a result, it is also possible to reduce the probability of multiple
failures to almost any desired level within reason by adopting such policies.
(Zero is of course an unattainable ideal.) |
|
The probability which is considered acceptable for any multiple failure
depends on its consequences. Sometimes levels of acceptability are specified
by regulatory authorities, but in the vast majority of cases the assessment
has to be made by the users of the asset. Since these consequences vary
hugely from system to system, what is deemed to be acceptable varies equally
widely. This means that there no universal standards of risk that can be
applied to all systems of a particular type (at least, not yet). |
|
But someone has to make a decision as to what level of risk is acceptable
before it is possible to decide what must be done to design, operate and
maintain protected systems. (In fact, merely persuading senior people to
accept that this is a manageable variable which they must therefore manage
is currently one of the biggest challenges facing maintenance professionals. |
|
Maxim
10
|
|
OLD
|
The quickest and
surest way to improve the performance of an
existing "unreliable"
asset is to upgrade the design
|
|
NEW
|
|
It is nearly always
more cost-effective to try to improve the performance of an unreliable
asset by improving the way it is operated and maintained, and only to review
the design if this cannot deliver the required performance
|
|
|
As we learn more and more about what must be done to maintain our assets
successfully, we learn just how many maintenance problems could have been
avoided or eliminated on the drawing board. This is leading to a long over-due
recognition that equipment designers should consider not only what must
be done to create new equipment that works, but also what must be done
to keep it working. |
|
However, this realisation shows a sometimes alarming tendency to be applied
inappropriately to the management of existing assets. A small but vocal
minority of people seem to believe that the best way to deal with reliability
problems is to go straight back to the drawing board, without stopping
to ask whether improved maintenance practices may not in fact be the best
solution to the problem. In practice, maintenance should be considered
before redesign for three reasons. |
-
Most modifications take from
6 months to 3 years from conception to commissioning, depending on the
cost and complexity of the new design. On the other hand the maintenance
person who is on duty today has to maintain the equipment as it exists
today, not what should be there or what might be there some time in the
future. So today's realities must be dealt with before tomorrow's redesigns.
|
-
Most organisations face many
more apparently desirable design improvement opportunities than are physically
or economically feasible. Trying first to extract the desired performance
from assets as they are currently configured does much to help develop
rational priorities for these projects, especially because it separates
those that are essential from those that are merely desirable.
|
-
There is no automatic guarantee
that a new design will actually solve the problem. The scrapyards of the
world are littered with modifications that "didn't quite work" - silent
testimony that second guessing the original designers often becomes an
expensive exercise in futility.
|
|
However, this is not meant to imply that we should never redesign existing
assets. Occasions often arise where the desired performance of an asset
exceeds its inherent reliability, in which case no amount of maintenance
can deliver the desired performance. In such cases "better" maintenance
cannot solve the problem, so we need to look beyond maintenance for the
solutions. Options include modifying the asset, changing operating procedures,
or simply lowering our expectations and deciding to live with the problem. |
|
Maxim
11
|
|
OLD
|
|
Generic maintenance
policies can be developed for most types of physical asset
|
|
NEW
|
|
Generic policies
should only be applied to identical assets whose operating context, functions
and desired standards of performance are also identical
|
|
|
The belief that generic maintenance policies can and should be applied
to most types of assets lies at the heart of nearly all traditional maintenance
programs. For instance, how often does one hear people say things like
"the maintenance policy which we apply to all our pumps is X" or "we have
a type Y calibration policy for all our instruments"? |
|
However, the correct use of techniques like RCM2 to develop maintenance
programs quickly shows why the in-appropriate use of generic maintenance
is one of the main reasons why so many traditional programs do not achieve
their full potential. The main reasons are as follows: |
-
Functions: the narrative
accompanying Figure 1 on page 2 explains how a pump can have one performance
expectation in one location, and a different expectation in another location.
Different performance standards of this type inevitably call for different
standards of maintenance. (This is especially true where otherwise identical
machines are used to produce products which have widely differing quality
standards.)
|
-
Failure modes: when otherwise
identical equipment is used in even slightly different locations (an area
of high humidity, an unusually dusty environment) or to perform slightly
different tasks (cutting a harder than usual metal, operating at a higher
temperature, pumping a more abrasive or a more acidic liquid), the possible
failure modes vary drastically. This in turn means that failure management
strategies need to vary accordingly
|
-
Failure consequences:
different failure consequences also demand different maintenance strategies.
This is illustrated by three otherwise identical pumps in Figure 9. Pump
A stands alone, so if it fails, operations will be affected sooner or later.
As a result the users and/or maintainers of Pump A are likely to make some
effort to anticipate or prevent its failure. (How hard they try will be
governed both by the effect on operations and by the severity and frequency
of the failures of the pump.)
|
|
However, if pump B fails, the operators simply switch to pump C, so the
only consequence of the failure of pump B is that it must be repaired.
As a result, it is probable that the operators of B would at least consider
letting it run to failure (especially if the failure of B does not cause
significant secondary damage.) |
|
|
On the other hand, if pump C fails while pump B is still working (for instance
if someone cannibalises a part from C), it is likely that the operators
will not even know that C has failed unless or until B also fails. To guard
against this possibility, a sensible maintenance strategy might be to run
C from time to time to find out whether it has failed. |
|
This example shows how three identical assets can have three totally different
maintenance policies, because the failure consequences are different in
each case. |
-
Maintenance tasks: different
organisations - or even different parts of the same organisation - seldom
employ people with identical skillsets. This means that people working
on one asset may prefer to use one type of pro-active technology (say high-tech
condition monitoring) to anticipate failure, while another group working
on an identical asset may be more comfortable using another (say a combination
of performance monitoring and the human senses). It is surprising how often
this does not matter, as long as the techniques chosen are cost-effective.
In fact, many maintenance organisations are starting to realize that there
is often more to be gained from ensuring that the people doing the work
are comfortable with what they are doing than it is to compel everyone
to do the same thing. (The validity of different tasks is also affected
by the operating context of each asset. For instance, think how background
noise levels affect checks for noise.)
|
|
All of this means that special care must be taken to ensure that the operating
context, functions and desired standards of performance are all virtually
identical before applying a maintenance policy designed for one asset to
another. |
|
Maxim
12
|
|
OLD
|
|
Maintenance policies
should be formulated by managers and maintenance schedules drawn up by
suitably qualified specialists or external contractors (a top-down approach)
|
|
NEW
|
|
Maintenance policies
should be formulated by the people closest to the assets. The role of management
is to provide the tools to help them make the right decisions, and to ensure
that the decisions are sensible and defensible
|
|
|
The traditional maintenance planning department typified the old maxim
in action. A key responsibility of this department was usually to compile
maintenance schedules for all the equipment in the plant. Maintenance planners
often devoted immense amounts of time and energy to this exercise (the
author knows - he was one once). However, more often than not, their schedules
died when they reached the shop floor. This happened for two main reasons: |
-
Technical validity: the
planners who wrote the schedules were usually out of touch with the equipment
(if they had ever been in touch to start with). As a result, they often
had a less than adequate understanding of the functions, the failure modes
and effects and the failure consequences of the assets for which their
schedules were being written. This meant that the schedules were usually
generic in nature, so people who were supposed to do them often saw them
as being incorrect if not totally irrelevant
|
-
Ownership: people on
the shop floor (supervisors and craftsmen) tended to view the schedules
as unwelcome paperwork which appeared from some ivory tower and disappeared
after it was signed off. Many of them learned that it was more comfortable
just to sign off the schedules and send them back than it was to attempt
to do them. (This led to inflated schedule completion rates which at least
kept the planners happy.) The main reason for the lack of interest was
undoubtedly sheer lack of ownership.
|
|
The only way around the problems of technical invalidity and lack of ownership
is to involve shop floor people directly in the maintenance strategy formulation
process. This is because they are the ones who really understand how the
equipment works, what goes wrong with it, how much each failure matters
and what must be done to fix it. |
|
The best way to access their knowledge on a systematic basis is to arrange
for them to participate formally in a series of meetings. However, it is
essential to ensure that these meetings do not just become another bunch
of inconclusive talkfests. This can be done by arranging for the participants
to be trained professionally in the use of RCM2, and to provide them with
skilled guidance in the application of this technique. |
|
Done correctly, this not only produces schedules with a much higher degree
of technical validity than anything that has gone before, but it also produces
an exceptionally high level of ownership of the final results. |
|
(A word of caution at this stage: It is wise to steer clear of the temptation
to use external contractors to formulate maintenance strategies. An outsider's
sheer ignorance of almost all the issues discussed in connection with maxims
1 through 11 insofar as they affect your plant means that all you are likely
to get is a set of elegantly completed forms that amount to little or nothing.
Using such people to develop maintenance programs is to wander into the
hazy - and dangerous - region where delegation becomes abdication.) |
|
Maxim
13
|
|
OLD
|
|
The maintenance
department on its own can develop a successful, lasting maintenance programme
|
|
NEW
|
|
A successful,
lasting maintenance program can only be developed by maintainers and users
of the assets working together
|
|
|
Maxim 12 above reminds us of the need to involve shop floor people as well
as managers in the maintenance strategy development process. Maxim 13 concerns
what is often a much more difficult challenge in many organizations - the
almost impenetrable divide between the maintenance and production functions. |
|
In fact, as the very first maxim in this series makes clear, maintenance
is all about ensuring that assets continue to function to standards of
performance required by the users. In nearly every situation, the "users"
are the production or operations functions. This means that modern maintenance
strategy formulation starts by asking the users what they want, with a
view to setting up asset management programs whose sole objective is to
ensure that the users get what they want. |
|
Clearly, for this to be possible, the users must be prepared to specify
exactly what they require. (If they do not bother to state the performance
they require from each asset with adequate precision, then of course they
cannot hold maintenance responsible for delivering that performance.) Both
users and maintainers must also take care at this stage to satisfy themselves
that the asset is capable of delivering the required performance to begin
with. |
|
In addition to spelling out what they want the asset to do, operators also
have a vital contribution to make to the rest of the strategy formulation
process. |
|
By participating in a suitably focused FMEA, they learn a great deal about
failure modes caused by human error, and hence what they must do to stop
breaking their machines. They also play a key role in evaluating failure
consequences (evidence of failure, acceptable levels of risk, effect on
output and product quality), and they have invaluable personal experience
of many of the most common warnings of failure (especially those detected
by the human senses). Finally, involvement in this process helps users
to understand much more clearly why they sometimes need to release machines
for maintenance, and also why operators need to be asked to carry out certain
maintenance tasks. |
|
In short, from a purely technical point of view, it is rapidly becoming
apparent that it is virtually impossible to set up a viable, lasting maintenance
program in most industrial undertakings without involving the users of
the assets. (This focus on the user - or customer - is of course the essence
of TQM.) If their involvement can be secured at all stages in the process,
that notorious barrier rapidly starts to disappear and the two departments
start to function, often for the first time ever, as a genuine team. |
|
Maxim
14
|
|
OLD
|
|
Equipment manufacturers
are in the best position to develop maintenance programs for new physical
assets
|
|
NEW
|
|
Equipment manufacturers
can only play a limited (but still important) role in developing maintenance
programs for new assets
|
|
|
A universal feature of traditional asset procurement is the insistence
that the equipment manufacturer should provide a maintenance program as
part of the supply contract for new equipment. Apart from any thing else,
this implies that manufacturers know everything that needs to be known
to draw up suitable maintenance programs. |
|
In fact, manufacturers are usually at best no better informed than traditional
maintenance planners about the operating context of the equipment, desired
standards of performance, context-specific failure modes and effects, failure
consequences and the skills of the user's operators and maintainers. More
often the manufacturers know nothing at all about these issues. As a result,
schedules compiled by manufacturers are nearly always generic, with all
the drawbacks discussed under maxim 11. |
|
Equipment manufacturers also have other agendas when specifying maintenance
programs (not least of which is to sell spares). What is more, they are
either committing the users' resources to doing the maintenance (in which
case they don't have to pay for it, so they have little interest in minimizing
it) or they may even be bidding to do the maintenance themselves (in which
case they have a vested interest in doing as much as possible). |
|
This combination of extraneous commercial agendas and ignorance about the
operating context means that maintenance programs specified by manufacturers
tend to embody a high level of over-maintenance (sometimes ludicrously
so) coupled with massive over-provisioning of spares. Most maintenance
professionals are aware of this problem. However, despite our awareness,
most of us persist in demanding that manufacturers provide these programs,
and then go on to accept that they must be followed in order for warranties
to remain valid (and so bind ourselves contractually to doing the work,
at least for the duration of the warranty period). |
|
None of this is meant to suggest that manufacturers mislead us deliberately
when they put together their recommendations. In fact, they usually do
their best in the context of their own business objectives and with the
information at their disposal. If anyone is at fault, it is really us -
the users - for making unreasonable requests of organisations which are
not in the best position to fulfil them. |
|
A small but growing number of users solve this problem by adopting a completely
different approach to the development of maintenance programs for new assets.
This entails asking the manufacturer to supply experienced field technicians
to work alongside the people who will eventually operate and maintain the
equipment, to use RCM2 to develop programs which are satisfactory to both
parties |
|
When adopting this approach, issues such as warranties, copyrights, languages
which the participants should be able to speak fluently, technical support,
confidentiality, and so on should be handled at the request for proposal/contracting
stage, so that everyone knows what to expect of each other. |
|
Note the suggestion to use field technicians rather than designers (designers
are often surprisingly reluctant to admit that their designs can fail,
which reduces their ability to help develop a sensible failure-management
program). The field technicians should of course have unrestricted access
to specialist support to help them answer difficult questions. |
|
In this way, the user gains access to the most useful information that
the manufacturer can provide, while still developing a maintenance program
which is most directly suited to the context in which the equipment will
actually be used. The manufacturer may lose a little in up-front sales
of spares and maintenance, but will definitely gain all the long-term benefits
associated with improved equipment performance, lower through-life costs
and a much better understanding of the real needs of his customer. A classic
win-win situation. |
|
Maxim
15
|
|
OLD
|
|
It is possible
to find a quick, one-shot solution to all our maintenance effectiveness
problems
|
|
NEW
|
|
Maintenance problems
are best solved in two stages: (1) change the way people think (2) get
them to apply their changed changed thought processes to technical/ process
problems - one step at a time
|
|
|
If one takes a moment to review the breadth and depth of the paradigm shift
implicit in the foregoing paragraphs, it soon becomes apparent just how
far most organisations have to move in order to adopt the new maxims. It
simply cannot happen overnight. |
|
Nonetheless, RCM2 enables most users to put into practice most of the changes
described in this paper in less than a year, and to recoup the associated
investment in a matter of months (if not weeks). However, so great is the
obsession which many businesses have with quick results that even this
is just not quick enough. Financial, regulatory and competitive pressures
all conspire to make people want lasting change now. As a result, people
tend to fall into the last and often saddest trap of all - the quest for
shortcuts. |
|
Unfortunately, in the experience of the author, this quest is invariably
counterproductive. Firstly, the development of the "shortcut" itself takes
time - time which is spent reinventing perfectly round wheels instead of
getting on with the job of improving asset performance. Secondly, shortcuts
nearly always end in sub-optimal solutions - so much so that they often
result in little or no change at all. |
|
In fact, people who seek an effective, enduring maintenance program which
has universal support should not lose sight of the fact that improvement
is a journey, not a destination (the essence of the Kaizen philosophy).
In the field of asset management, this means that we should turn away from
the search for a silver bullet which will blow away all our problems in
an instant - the 1 x 100% solution. Success is far more likely to be assured
if we think in terms of a silver shotgun shell, and set out to blow away
our problems one pellet (or one failure mode) at a time - the 1000 x 0.1%
approach which virtually guarantees 100% success to those with the patience
to try it. |
| Thank you - and good hunting! |
| References: |
| Moubray J M (1997) "Reliability-centered
Maintenance". 2nd Edition, Industrial Press, New York, NY |
| Nowlan F S and Heap H (1978)
"Reliability-centered Maintenance". National Technical Information Service,
US Department of Commerce, Springfield, Virginia |
| Resnikoff H L (1978) "Mathematical
Aspects of Reliability-centered Maintenance". Dolby Access Press, Los Altos,
California |
|
This article is contributed
by John Moubray, Managing
Director, Aladon Ltd.
|
|
Return
to the Reliability Centered Maintenance Reference Articles Index
|
|
© Copyright 2007
Maintenance Resources, Inc.
|
|
Phone: 812.877.7119
- Fax: 812.877.7116 - E-Mail: info@maintenanceresources.com
|
|
Address: 1983 North Hunt